Customization: | Available |
---|---|
After-sales Service: | yes |
Warranty: | one-year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The TBT-0609 Thin Film Oven(82 type oven for short) is design and made as per T0609-1993 Thin Film Oven Test in the industrial standard of People's Republic of China JTG E20-2011 Specification and Test Methods of Bitumen and Bituminous Mixture for Highway Engineering.
It is suitable to test the quality loss after heating the road asphalt film. And also test the change of needle penetration, softening point, breaking point and ductility for asphalt residue as need to evaluate the aging resistance property of asphalt.Power supply | 220VAC±10%,50Hz |
Power | 2.5KW |
Temperature of workroom | 163ºC±0.5ºC |
Temperature control accuracy | ±0.5ºC |
Rotate speed of turn plate | (5.5r±1r)/min |
Test sample quantity | 4 pieces |
Size of workroom | 450mm×450mm×510mm |
Ambient temperature | 5ºC~50ºC |
Relative humidity | ≤85% |
No. | Name | Unit | Qty | Memo |
1 | TBT-0609 Asphalt Thin Film Oven | Set | 1 | |
2 | Sample container | Piece | 4 | |
3 | Mercury thermometer | Piece | 1 | 150-170ºC, scale division is 0.5ºC |
4 | Fuse RL 15A | Piece | 2 | Reserve |
5 | Socket(250V 16A three-core) | Piece | 1 | |
6 | Operation Manual | Piece | 1 | |
7 | Temperature control device usage manual | Piece | 1 | |
8 | Quality Certificate | Piece | 1 | |
9 | Repair Guarantee | Piece | 1 |
No. | Name | Specification | Quantity | Memo |
1 | Balance | Range 1kg,200g | Each 1 set | |
2 | Asphalt solution | 1L | 1L/bucket | Trichloroethylene,kerosene,gasoline,choose one. |
3 | Drying oven | Medium-sized | 1 piece |
1. How long is the delivery time?
Normally goods will be shipped out within 7-10days after contract signed and down payment received.
2. Is it possible to make our own brand/logo on your product?
Yes, but depends on MOQ.
3. What's your MOQ?
This depends on different types of products. If it is a large machine, the MOQ is usually 1 set. For small instruments, such as thermometers, the MOQ is 50 pieces.
4. What kind of payment term you accept?
Normally,
1) If total contract value less than USD 10,000.00 : 100% T/T in advance after contract signed.
2) If total contract value more than USD 10000.00 : 50% T/T in advance after contract signed and 50% T/T after receipt of BL copy. Or, irrevocable LC is acceptable.