Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | one-year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The instrument is designed and made as per the National Standard GB/T 4508 "Test Methods for Ductility of Petroleum Asphalt", and T0605 "Asphalt Ductility Test" in the Industry Standard JTJ052 Specification and Test Methods of Bitumen and Bituminous Mixture for Highway Engineering. It is suitable to determine the length of petroleum asphalt when it is dragged to broken at certain speed under stipulated condition and temperature. It is indicated by cm.
1. It integrates achievements of domestic and overseas design concepts on ductility tester. It is advanced and delicate.
2. There is no thread rod, guide rail and other device in the test trough, so it is convenient to install test sample.
3. Equipped with newly designed driving parts, it is stable and synchronous without shake during dragging procedure. The dragging speed is uniform and the ductility is accurate.
4. It can make determination for 3 pieces of sample at the same time.
5. It adopts digital temperature controller, high precision sensor and magnetic circulation pump, so the bath can be adequately circulated and the controlling temperature is precise.
6. The test sample holder can return back automatically. It will take about 10 min to return back for 1.5 meter distance.
Power supply: | AC 220 V (-5%~+10%), 50 Hz; |
Measurement range: | 1.5 m (± 10mm); |
Heating type: | by an electric heater; |
Heating power | 3000 W; |
Bath circulation: | by a magnetic circulation pump |
Temperature controlling range: | 5~49 º C; digitally displayed; |
Temperature controlling accuracy | ± 0.5 º C; |
Dragging speed: | two grades, 10~50 mm/min |
Measurement accuracy: | ± 1 mm; |
Refrigeration type | by a compressor; input power is 950 W; |
Ductility display: | Controlled by microprocessor; digitally displayed after data processing |
Ambient temperature | -10~+35 º C; |
Relative humidity: | ≤ 85%; |
Total power consumption: | not more than 4100 W; |
1. How long is the delivery time?
Normally goods will be shipped out within 7-10days after contract signed and down payment received.
2. Is it possible to make our own brand/logo on your product?
Yes, but depends on MOQ.
3. What's your MOQ?
This depends on different types of products. If it is a large machine, the MOQ is usually 1 set. For small instruments, such as thermometers, the MOQ is 50 pieces.
4. What kind of payment term you accept?
Normally,
1) If total contract value less than USD 10,000.00 : 100% T/T in advance after contract signed.
2) If total contract value more than USD 10000.00 : 50% T/T in advance after contract signed and 50% T/T after receipt of BL copy. Or, irrevocable LC is acceptable.