Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The two-wheel continuous friction measuring equipment (CFME) utilizes a system of skidding a special non treaded tyre across the pavement surface and measures the resultant resistance force to calculate surface frictional properties.
Description | Specification |
Trailer size | 1553x960x570mm (LxWxH) |
Trailer connector height | 350±12mm |
Trailer weight | 254kg (without the support wheel) |
Weight distribute | Left wheel--at calibrated height position 77.5±1kg |
Weight distribute | Right wheel--at calibrated height position 77.5±1kg |
Testing wheel adjustment | Double wheel adjustment: left/right wheel 7.5° each wheel Single wheel adjustment: right wheel 15° |
Rear wheel | 53.5kg |
Testing wheel (especially for friction coefficient test) | ASTM 1551E |
Testing wheel for distance | Standard tyre |
Tyre pressure | Testing wheel for friction coefficient: 0.7±0.035kg/cm2 Testing wheel for distance: 2.1±0.137kg/cm2 |
Speed | 0~100km/h |
Testing speed for international airport | 65km/h and 96km/h |
Testing speed for standard pavement used in China | 50km/h |
Working voltage | DC 9-36V (12V, 24V vehicle power can be used) |
Electronic component | Internet interface, laptop |
Friction coefficient testing accuracy | Average value ±0.01 |
Distance testing accuracy | ±0.1% (plus tyre abrasion) |
Temp. measuring | Pavement surface temp. sensor |
Testing accuracy | ±1% |
Water sprinkler system (optional) | Manual or automatic control |
1. How long is the delivery time?
Normally goods will be shipped out within 7-10days after contract signed and down payment received.
2. Is it possible to make our own brand/logo on your product?
Yes, but depends on MOQ.
3. What's your MOQ?
This depends on different types of products. If it is a large machine, the MOQ is usually 1 set. For small instruments, such as thermometers, the MOQ is 50 pieces.
4. What kind of payment term you accept?
Normally,
1) If total contract value less than USD 10,000.00 : 100% T/T in advance after contract signed.
2) If total contract value more than USD 10000.00 : 50% T/T in advance after contract signed and 50% T/T after receipt of BL copy. Or, irrevocable LC is acceptable.