Customization: | Available |
---|---|
After-sales Service: | Quick and effective after sales service |
Warranty: | Quick and effective after sales service |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The instrument is designed and made as per GB/T4507 Standard Test Methods for Softening Point of Petroleum Asphalt of National Standard of People's Republic of China , T0608 Asphalt Softening Point Test (Ring-and-Ball Apparatus) in the industrial standard of People's Republic of China JTG E20-2011 Specification and Test Methods of Bitumen and Bituminous Mixture for Highway Engineering. It is suitable to determine softening point of petroleum asphalt, coal pitch, liquid petroleum asphalt, and various asphalts. It can be widely used for asphalt manufacturing companies, highway and bridge construction companies, relative colleges and universities, and scientific research institutes.
Power supply: | AC 220V±10%, 50 Hz |
Environment: | The room temperature≤ 35 ºC, and keep stable without air convection. |
Measurement range: | 32ºC~150 ºC; ±1.0 ºC |
Stirrer: | The stirring speed can be continuously adjusted. |
Heating power: | 800 W |
Heating medium: | glycerin |
Beaker cubage: | 1000 ml |
Relative humidity: | ≤ 85% |
Total power consumption: | ≤ 850 W |
Test sample: | 2 samples |
No. | Item | Unit | Qty | Remarks |
1 | Steel ball locator | Piece | 2 | |
2 | Shoulder ring | Piece | 2 | |
3 | Steel ball (Φ9) | Piece | 2 | |
4 | Beaker | Piece | 1 | |
5 | Stirring bar | Piece | 1 | |
6 | Temperature sensor cable | Piece | 1 | |
7 | 6A fuse (Φ5×20) | Piece | 2 |
1. How long is the delivery time?
Normally goods will be shipped out within 7-10days after contract signed and down payment received.
2. Is it possible to make our own brand/logo on your product?
Yes, but depends on MOQ.
3. What's your MOQ?
This depends on different types of products. If it is a large machine, the MOQ is usually 1 set. For small instruments, such as thermometers, the MOQ is 50 pieces.
4. What kind of payment term you accept?
Normally,
1) If total contract value less than USD 10,000.00 : 100% T/T in advance after contract signed.
2) If total contract value more than USD 10000.00 : 50% T/T in advance after contract signed and 50% T/T after receipt of BL copy. Or, irrevocable LC is acceptable.