Customization: | Available |
---|---|
After-sales Service: | yes |
Warranty: | one-year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The X-ray pipeline crawler include the special part that can detect the welding line of long pipeline. The X-ray pipeline crawlers have the advantages of high radiographic quality, high imaging sensitivity, low failure rate and high work efficiency.
The X-ray pipeline crawlers have differential driving and vibration absorbers. The chassis of the X-ray pipeline crawlers can be moved in the pipeline steadily without off center running and overturning. The X-ray pipeline crawlers can be moved in the pipeline with great efficiency because it is controlled by PLC with protecting it from blocking and undervoltage. The X-ray pipeline crawler is easy to be separated into several parts and then to be put together, so it is easy to carry. You can change the exposure parameter and make the X-ray pipeline crawler move, stop and have an exposure with the exterior controlling source. The X-ray pipeline crawlers are easy to operate.
Type | X-PCD2000-1 | X-PCD2000-2 | X-PCD-3 |
Penetration Pipe Diameter | 300-1200 | 273-800mm | 159-400mm |
Formal Size | 1.0*0.25m | 0.85*0.2m | 1.0*0.15m |
Total Weight | 50kg | 45kg | 30kg |
Total Weight | 50kg | 45kg | 30kg |
Motor Power | 12W (continuous) | 120W (continuous) | 80W (continuous) |
BatteryPower | 24V 14Ah | 24V 14Ah | 24V 14Ah |
Crawling Speed | 15-18m/min | 15-18m/min | 15-18m/min |
Crawling Slope | 30° | 30° | 30° |
Swerving Radii | 5D | 5D | 10D |
Radiative Source | Ir-192(5-100ci) | Ir-192(5-100ci) | Ir-192(5-100ci) |
Se75(5-100ci) | Se75(5-100ci) | Se75(5-100ci) | |
Radiative Angle | 45° | 45° | 45° |
Time of Exposure | 30 Minutes (continuous) | 30 Minutes (continuous) | 30 Minutes (continuous) |
Time of Delay | 30s | 30s | 30s |
Positioning Source | 200mci Cs 137 | 200mci Cs 137 | 200mci Cs 137 |
Crawling Distance | 5Km* 2 | 3Km* 2 | 3Km* 2 |
Relative Humidity | < 70° | < 70° | < 70° |
Environment Humidity | 10-90%RH (incondensable) | 10-90%RH (incondensable) | 10-90%RH (incondensable) |
1. How long is the delivery time?
Normally goods will be shipped out within 7-10days after contract signed and down payment received.
2. Is it possible to make our own brand/logo on your product?
Yes, but depends on MOQ.
3. What's your MOQ?
This depends on different types of products. If it is a large machine, the MOQ is usually 1 set. For small instruments, such as thermometers, the MOQ is 50 pieces.
4. What kind of payment term you accept?
Normally,
1) If total contract value less than USD 10,000.00 : 100% T/T in advance after contract signed.
2) If total contract value more than USD 10000.00 : 50% T/T in advance after contract signed and 50% T/T after receipt of BL copy. Or, irrevocable LC is acceptable